Home>> Install
 
 
Notes:
¡ù The above chart is for reference only, you can adjust according to the practical condition.
¡ù In general, the refrigerated air dryer to be installed after the after-cooler or gas storage holder to avoid the overload working & striking.
¡ù Install a HF7 grade filter before refrigerated air dryer in order to reduce the pollution of heat exchanger.
¡ù Should install by-pass piping and by-pass valve in the inlet & outlet of the dryer for maintenance and checking.
¡ù Should keep more than 1 mile among air dryers so that they can cooling down & be checked.
   
 
Shanghai HOLYSUN Machinery Technology Co., Ltd. @ 2007 All Rights Reserved¡¡TEL£º021-66083210¡¡FAX£º021-66082343